<feed xmlns='http://www.w3.org/2005/Atom'>
<title>linux-stable.git/kernel/sched/deadline.c, branch linux-4.4.y</title>
<subtitle>Linux kernel stable tree</subtitle>
<link rel='alternate' type='text/html' href='https://git.tavy.me/linux-stable.git/'/>
<entry>
<title>sched/deadline: Use the revised wakeup rule for suspending constrained dl tasks</title>
<updated>2018-01-31T11:06:07+00:00</updated>
<author>
<name>Daniel Bristot de Oliveira</name>
<email>bristot@redhat.com</email>
</author>
<published>2017-05-29T14:24:03+00:00</published>
<link rel='alternate' type='text/html' href='https://git.tavy.me/linux-stable.git/commit/?id=1d00e3d9b7ed8fbf6729b7c5a8aae9f2711d2655'/>
<id>1d00e3d9b7ed8fbf6729b7c5a8aae9f2711d2655</id>
<content type='text'>
commit 3effcb4247e74a51f5d8b775a1ee4abf87cc089a upstream.

We have been facing some problems with self-suspending constrained
deadline tasks. The main reason is that the original CBS was not
designed for such sort of tasks.

One problem reported by Xunlei Pang takes place when a task
suspends, and then is awakened before the deadline, but so close
to the deadline that its remaining runtime can cause the task
to have an absolute density higher than allowed. In such situation,
the original CBS assumes that the task is facing an early activation,
and so it replenishes the task and set another deadline, one deadline
in the future. This rule works fine for implicit deadline tasks.
Moreover, it allows the system to adapt the period of a task in which
the external event source suffered from a clock drift.

However, this opens the window for bandwidth leakage for constrained
deadline tasks. For instance, a task with the following parameters:

  runtime   = 5 ms
  deadline  = 7 ms
  [density] = 5 / 7 = 0.71
  period    = 1000 ms

If the task runs for 1 ms, and then suspends for another 1ms,
it will be awakened with the following parameters:

  remaining runtime = 4
  laxity = 5

presenting a absolute density of 4 / 5 = 0.80.

In this case, the original CBS would assume the task had an early
wakeup. Then, CBS will reset the runtime, and the absolute deadline will
be postponed by one relative deadline, allowing the task to run.

The problem is that, if the task runs this pattern forever, it will keep
receiving bandwidth, being able to run 1ms every 2ms. Following this
behavior, the task would be able to run 500 ms in 1 sec. Thus running
more than the 5 ms / 1 sec the admission control allowed it to run.

Trying to address the self-suspending case, Luca Abeni, Giuseppe
Lipari, and Juri Lelli [1] revisited the CBS in order to deal with
self-suspending tasks. In the new approach, rather than
replenishing/postponing the absolute deadline, the revised wakeup rule
adjusts the remaining runtime, reducing it to fit into the allowed
density.

A revised version of the idea is:

At a given time t, the maximum absolute density of a task cannot be
higher than its relative density, that is:

  runtime / (deadline - t) &lt;= dl_runtime / dl_deadline

Knowing the laxity of a task (deadline - t), it is possible to move
it to the other side of the equality, thus enabling to define max
remaining runtime a task can use within the absolute deadline, without
over-running the allowed density:

  runtime = (dl_runtime / dl_deadline) * (deadline - t)

For instance, in our previous example, the task could still run:

  runtime = ( 5 / 7 ) * 5
  runtime = 3.57 ms

Without causing damage for other deadline tasks. It is note worthy
that the laxity cannot be negative because that would cause a negative
runtime. Thus, this patch depends on the patch:

  df8eac8cafce ("sched/deadline: Throttle a constrained deadline task activated after the deadline")

Which throttles a constrained deadline task activated after the
deadline.

Finally, it is also possible to use the revised wakeup rule for
all other tasks, but that would require some more discussions
about pros and cons.

[The main difference from the original commit is that
 the BW_SHIFT define was not present yet. As BW_SHIFT was
 introduced in a new feature, I just used the value (20),
 likewise we used to use before the #define.
 Other changes were required because of comments. - bistrot]

Reported-by: Xunlei Pang &lt;xpang@redhat.com&gt;
Signed-off-by: Daniel Bristot de Oliveira &lt;bristot@redhat.com&gt;
[peterz: replaced dl_is_constrained with dl_is_implicit]
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Cc: Juri Lelli &lt;juri.lelli@arm.com&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Luca Abeni &lt;luca.abeni@santannapisa.it&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Peter Zijlstra &lt;peterz@infradead.org&gt;
Cc: Romulo Silva de Oliveira &lt;romulo.deoliveira@ufsc.br&gt;
Cc: Steven Rostedt &lt;rostedt@goodmis.org&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Cc: Tommaso Cucinotta &lt;tommaso.cucinotta@sssup.it&gt;
Link: http://lkml.kernel.org/r/5c800ab3a74a168a84ee5f3f84d12a02e11383be.1495803804.git.bristot@redhat.com
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
Signed-off-by: Daniel Bristot de Oliveira &lt;bristot@redhat.com&gt;
Signed-off-by: Greg Kroah-Hartman &lt;gregkh@linuxfoundation.org&gt;
</content>
<content type='xhtml'>
<div xmlns='http://www.w3.org/1999/xhtml'>
<pre>
commit 3effcb4247e74a51f5d8b775a1ee4abf87cc089a upstream.

We have been facing some problems with self-suspending constrained
deadline tasks. The main reason is that the original CBS was not
designed for such sort of tasks.

One problem reported by Xunlei Pang takes place when a task
suspends, and then is awakened before the deadline, but so close
to the deadline that its remaining runtime can cause the task
to have an absolute density higher than allowed. In such situation,
the original CBS assumes that the task is facing an early activation,
and so it replenishes the task and set another deadline, one deadline
in the future. This rule works fine for implicit deadline tasks.
Moreover, it allows the system to adapt the period of a task in which
the external event source suffered from a clock drift.

However, this opens the window for bandwidth leakage for constrained
deadline tasks. For instance, a task with the following parameters:

  runtime   = 5 ms
  deadline  = 7 ms
  [density] = 5 / 7 = 0.71
  period    = 1000 ms

If the task runs for 1 ms, and then suspends for another 1ms,
it will be awakened with the following parameters:

  remaining runtime = 4
  laxity = 5

presenting a absolute density of 4 / 5 = 0.80.

In this case, the original CBS would assume the task had an early
wakeup. Then, CBS will reset the runtime, and the absolute deadline will
be postponed by one relative deadline, allowing the task to run.

The problem is that, if the task runs this pattern forever, it will keep
receiving bandwidth, being able to run 1ms every 2ms. Following this
behavior, the task would be able to run 500 ms in 1 sec. Thus running
more than the 5 ms / 1 sec the admission control allowed it to run.

Trying to address the self-suspending case, Luca Abeni, Giuseppe
Lipari, and Juri Lelli [1] revisited the CBS in order to deal with
self-suspending tasks. In the new approach, rather than
replenishing/postponing the absolute deadline, the revised wakeup rule
adjusts the remaining runtime, reducing it to fit into the allowed
density.

A revised version of the idea is:

At a given time t, the maximum absolute density of a task cannot be
higher than its relative density, that is:

  runtime / (deadline - t) &lt;= dl_runtime / dl_deadline

Knowing the laxity of a task (deadline - t), it is possible to move
it to the other side of the equality, thus enabling to define max
remaining runtime a task can use within the absolute deadline, without
over-running the allowed density:

  runtime = (dl_runtime / dl_deadline) * (deadline - t)

For instance, in our previous example, the task could still run:

  runtime = ( 5 / 7 ) * 5
  runtime = 3.57 ms

Without causing damage for other deadline tasks. It is note worthy
that the laxity cannot be negative because that would cause a negative
runtime. Thus, this patch depends on the patch:

  df8eac8cafce ("sched/deadline: Throttle a constrained deadline task activated after the deadline")

Which throttles a constrained deadline task activated after the
deadline.

Finally, it is also possible to use the revised wakeup rule for
all other tasks, but that would require some more discussions
about pros and cons.

[The main difference from the original commit is that
 the BW_SHIFT define was not present yet. As BW_SHIFT was
 introduced in a new feature, I just used the value (20),
 likewise we used to use before the #define.
 Other changes were required because of comments. - bistrot]

Reported-by: Xunlei Pang &lt;xpang@redhat.com&gt;
Signed-off-by: Daniel Bristot de Oliveira &lt;bristot@redhat.com&gt;
[peterz: replaced dl_is_constrained with dl_is_implicit]
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Cc: Juri Lelli &lt;juri.lelli@arm.com&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Luca Abeni &lt;luca.abeni@santannapisa.it&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Peter Zijlstra &lt;peterz@infradead.org&gt;
Cc: Romulo Silva de Oliveira &lt;romulo.deoliveira@ufsc.br&gt;
Cc: Steven Rostedt &lt;rostedt@goodmis.org&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Cc: Tommaso Cucinotta &lt;tommaso.cucinotta@sssup.it&gt;
Link: http://lkml.kernel.org/r/5c800ab3a74a168a84ee5f3f84d12a02e11383be.1495803804.git.bristot@redhat.com
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
Signed-off-by: Daniel Bristot de Oliveira &lt;bristot@redhat.com&gt;
Signed-off-by: Greg Kroah-Hartman &lt;gregkh@linuxfoundation.org&gt;
</pre>
</div>
</content>
</entry>
<entry>
<title>sched/deadline: Zero out positive runtime after throttling constrained tasks</title>
<updated>2018-01-23T18:50:15+00:00</updated>
<author>
<name>Xunlei Pang</name>
<email>xlpang@redhat.com</email>
</author>
<published>2017-05-10T13:03:37+00:00</published>
<link rel='alternate' type='text/html' href='https://git.tavy.me/linux-stable.git/commit/?id=8bd58b61d2faacdacd05287a3bbb32ad226b5428'/>
<id>8bd58b61d2faacdacd05287a3bbb32ad226b5428</id>
<content type='text'>
commit ae83b56a56f8d9643dedbee86b457fa1c5d42f59 upstream.

When a contrained task is throttled by dl_check_constrained_dl(),
it may carry the remaining positive runtime, as a result when
dl_task_timer() fires and calls replenish_dl_entity(), it will
not be replenished correctly due to the positive dl_se-&gt;runtime.

This patch assigns its runtime to 0 if positive after throttling.

Signed-off-by: Xunlei Pang &lt;xlpang@redhat.com&gt;
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Acked-by: Daniel Bristot de Oliveira &lt;bristot@redhat.com&gt;
Cc: Juri Lelli &lt;juri.lelli@arm.com&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Luca Abeni &lt;luca.abeni@santannapisa.it&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Peter Zijlstra &lt;peterz@infradead.org&gt;
Cc: Steven Rostedt &lt;rostedt@goodmis.org&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Fixes: df8eac8cafce ("sched/deadline: Throttle a constrained deadline task activated after the deadline)
Link: http://lkml.kernel.org/r/1494421417-27550-1-git-send-email-xlpang@redhat.com
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
Cc: Ben Hutchings &lt;ben.hutchings@codethink.co.uk&gt;
Signed-off-by: Greg Kroah-Hartman &lt;gregkh@linuxfoundation.org&gt;

</content>
<content type='xhtml'>
<div xmlns='http://www.w3.org/1999/xhtml'>
<pre>
commit ae83b56a56f8d9643dedbee86b457fa1c5d42f59 upstream.

When a contrained task is throttled by dl_check_constrained_dl(),
it may carry the remaining positive runtime, as a result when
dl_task_timer() fires and calls replenish_dl_entity(), it will
not be replenished correctly due to the positive dl_se-&gt;runtime.

This patch assigns its runtime to 0 if positive after throttling.

Signed-off-by: Xunlei Pang &lt;xlpang@redhat.com&gt;
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Acked-by: Daniel Bristot de Oliveira &lt;bristot@redhat.com&gt;
Cc: Juri Lelli &lt;juri.lelli@arm.com&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Luca Abeni &lt;luca.abeni@santannapisa.it&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Peter Zijlstra &lt;peterz@infradead.org&gt;
Cc: Steven Rostedt &lt;rostedt@goodmis.org&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Fixes: df8eac8cafce ("sched/deadline: Throttle a constrained deadline task activated after the deadline)
Link: http://lkml.kernel.org/r/1494421417-27550-1-git-send-email-xlpang@redhat.com
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
Cc: Ben Hutchings &lt;ben.hutchings@codethink.co.uk&gt;
Signed-off-by: Greg Kroah-Hartman &lt;gregkh@linuxfoundation.org&gt;

</pre>
</div>
</content>
</entry>
<entry>
<title>sched/deadline: Use deadline instead of period when calculating overflow</title>
<updated>2017-12-20T09:04:55+00:00</updated>
<author>
<name>Steven Rostedt (VMware)</name>
<email>rostedt@goodmis.org</email>
</author>
<published>2017-03-02T14:10:59+00:00</published>
<link rel='alternate' type='text/html' href='https://git.tavy.me/linux-stable.git/commit/?id=51b3eac39a6ce8e90b1faad510f8fdaed2805b62'/>
<id>51b3eac39a6ce8e90b1faad510f8fdaed2805b62</id>
<content type='text'>
[ Upstream commit 2317d5f1c34913bac5971d93d69fb6c31bb74670 ]

I was testing Daniel's changes with his test case, and tweaked it a
little. Instead of having the runtime equal to the deadline, I
increased the deadline ten fold.

Daniel's test case had:

	attr.sched_runtime  = 2 * 1000 * 1000;		/* 2 ms */
	attr.sched_deadline = 2 * 1000 * 1000;		/* 2 ms */
	attr.sched_period   = 2 * 1000 * 1000 * 1000;	/* 2 s */

To make it more interesting, I changed it to:

	attr.sched_runtime  =  2 * 1000 * 1000;		/* 2 ms */
	attr.sched_deadline = 20 * 1000 * 1000;		/* 20 ms */
	attr.sched_period   =  2 * 1000 * 1000 * 1000;	/* 2 s */

The results were rather surprising. The behavior that Daniel's patch
was fixing came back. The task started using much more than .1% of the
CPU. More like 20%.

Looking into this I found that it was due to the dl_entity_overflow()
constantly returning true. That's because it uses the relative period
against relative runtime vs the absolute deadline against absolute
runtime.

  runtime / (deadline - t) &gt; dl_runtime / dl_period

There's even a comment mentioning this, and saying that when relative
deadline equals relative period, that the equation is the same as using
deadline instead of period. That comment is backwards! What we really
want is:

  runtime / (deadline - t) &gt; dl_runtime / dl_deadline

We care about if the runtime can make its deadline, not its period. And
then we can say "when the deadline equals the period, the equation is
the same as using dl_period instead of dl_deadline".

After correcting this, now when the task gets enqueued, it can throttle
correctly, and Daniel's fix to the throttling of sleeping deadline
tasks works even when the runtime and deadline are not the same.

Signed-off-by: Steven Rostedt (VMware) &lt;rostedt@goodmis.org&gt;
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Reviewed-by: Daniel Bristot de Oliveira &lt;bristot@redhat.com&gt;
Cc: Juri Lelli &lt;juri.lelli@arm.com&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Luca Abeni &lt;luca.abeni@santannapisa.it&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Peter Zijlstra &lt;peterz@infradead.org&gt;
Cc: Romulo Silva de Oliveira &lt;romulo.deoliveira@ufsc.br&gt;
Cc: Steven Rostedt &lt;rostedt@goodmis.org&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Cc: Tommaso Cucinotta &lt;tommaso.cucinotta@sssup.it&gt;
Link: http://lkml.kernel.org/r/02135a27f1ae3fe5fd032568a5a2f370e190e8d7.1488392936.git.bristot@redhat.com
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
Signed-off-by: Sasha Levin &lt;alexander.levin@verizon.com&gt;
Signed-off-by: Greg Kroah-Hartman &lt;gregkh@linuxfoundation.org&gt;
</content>
<content type='xhtml'>
<div xmlns='http://www.w3.org/1999/xhtml'>
<pre>
[ Upstream commit 2317d5f1c34913bac5971d93d69fb6c31bb74670 ]

I was testing Daniel's changes with his test case, and tweaked it a
little. Instead of having the runtime equal to the deadline, I
increased the deadline ten fold.

Daniel's test case had:

	attr.sched_runtime  = 2 * 1000 * 1000;		/* 2 ms */
	attr.sched_deadline = 2 * 1000 * 1000;		/* 2 ms */
	attr.sched_period   = 2 * 1000 * 1000 * 1000;	/* 2 s */

To make it more interesting, I changed it to:

	attr.sched_runtime  =  2 * 1000 * 1000;		/* 2 ms */
	attr.sched_deadline = 20 * 1000 * 1000;		/* 20 ms */
	attr.sched_period   =  2 * 1000 * 1000 * 1000;	/* 2 s */

The results were rather surprising. The behavior that Daniel's patch
was fixing came back. The task started using much more than .1% of the
CPU. More like 20%.

Looking into this I found that it was due to the dl_entity_overflow()
constantly returning true. That's because it uses the relative period
against relative runtime vs the absolute deadline against absolute
runtime.

  runtime / (deadline - t) &gt; dl_runtime / dl_period

There's even a comment mentioning this, and saying that when relative
deadline equals relative period, that the equation is the same as using
deadline instead of period. That comment is backwards! What we really
want is:

  runtime / (deadline - t) &gt; dl_runtime / dl_deadline

We care about if the runtime can make its deadline, not its period. And
then we can say "when the deadline equals the period, the equation is
the same as using dl_period instead of dl_deadline".

After correcting this, now when the task gets enqueued, it can throttle
correctly, and Daniel's fix to the throttling of sleeping deadline
tasks works even when the runtime and deadline are not the same.

Signed-off-by: Steven Rostedt (VMware) &lt;rostedt@goodmis.org&gt;
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Reviewed-by: Daniel Bristot de Oliveira &lt;bristot@redhat.com&gt;
Cc: Juri Lelli &lt;juri.lelli@arm.com&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Luca Abeni &lt;luca.abeni@santannapisa.it&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Peter Zijlstra &lt;peterz@infradead.org&gt;
Cc: Romulo Silva de Oliveira &lt;romulo.deoliveira@ufsc.br&gt;
Cc: Steven Rostedt &lt;rostedt@goodmis.org&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Cc: Tommaso Cucinotta &lt;tommaso.cucinotta@sssup.it&gt;
Link: http://lkml.kernel.org/r/02135a27f1ae3fe5fd032568a5a2f370e190e8d7.1488392936.git.bristot@redhat.com
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
Signed-off-by: Sasha Levin &lt;alexander.levin@verizon.com&gt;
Signed-off-by: Greg Kroah-Hartman &lt;gregkh@linuxfoundation.org&gt;
</pre>
</div>
</content>
</entry>
<entry>
<title>sched/deadline: Throttle a constrained deadline task activated after the deadline</title>
<updated>2017-12-20T09:04:55+00:00</updated>
<author>
<name>Daniel Bristot de Oliveira</name>
<email>bristot@redhat.com</email>
</author>
<published>2017-03-02T14:10:58+00:00</published>
<link rel='alternate' type='text/html' href='https://git.tavy.me/linux-stable.git/commit/?id=ca91884bcf7de730344ab13cbcaf4279e7fe38a7'/>
<id>ca91884bcf7de730344ab13cbcaf4279e7fe38a7</id>
<content type='text'>
[ Upstream commit df8eac8cafce7d086be3bd5cf5a838fa37594dfb ]

During the activation, CBS checks if it can reuse the current task's
runtime and period. If the deadline of the task is in the past, CBS
cannot use the runtime, and so it replenishes the task. This rule
works fine for implicit deadline tasks (deadline == period), and the
CBS was designed for implicit deadline tasks. However, a task with
constrained deadline (deadine &lt; period) might be awakened after the
deadline, but before the next period. In this case, replenishing the
task would allow it to run for runtime / deadline. As in this case
deadline &lt; period, CBS enables a task to run for more than the
runtime / period. In a very loaded system, this can cause a domino
effect, making other tasks miss their deadlines.

To avoid this problem, in the activation of a constrained deadline
task after the deadline but before the next period, throttle the
task and set the replenishing timer to the begin of the next period,
unless it is boosted.

Reproducer:

 --------------- %&lt; ---------------
  int main (int argc, char **argv)
  {
	int ret;
	int flags = 0;
	unsigned long l = 0;
	struct timespec ts;
	struct sched_attr attr;

	memset(&amp;attr, 0, sizeof(attr));
	attr.size = sizeof(attr);

	attr.sched_policy   = SCHED_DEADLINE;
	attr.sched_runtime  = 2 * 1000 * 1000;		/* 2 ms */
	attr.sched_deadline = 2 * 1000 * 1000;		/* 2 ms */
	attr.sched_period   = 2 * 1000 * 1000 * 1000;	/* 2 s */

	ts.tv_sec = 0;
	ts.tv_nsec = 2000 * 1000;			/* 2 ms */

	ret = sched_setattr(0, &amp;attr, flags);

	if (ret &lt; 0) {
		perror("sched_setattr");
		exit(-1);
	}

	for(;;) {
		/* XXX: you may need to adjust the loop */
		for (l = 0; l &lt; 150000; l++);
		/*
		 * The ideia is to go to sleep right before the deadline
		 * and then wake up before the next period to receive
		 * a new replenishment.
		 */
		nanosleep(&amp;ts, NULL);
	}

	exit(0);
  }
  --------------- &gt;% ---------------

On my box, this reproducer uses almost 50% of the CPU time, which is
obviously wrong for a task with 2/2000 reservation.

Signed-off-by: Daniel Bristot de Oliveira &lt;bristot@redhat.com&gt;
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Cc: Juri Lelli &lt;juri.lelli@arm.com&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Luca Abeni &lt;luca.abeni@santannapisa.it&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Peter Zijlstra &lt;peterz@infradead.org&gt;
Cc: Romulo Silva de Oliveira &lt;romulo.deoliveira@ufsc.br&gt;
Cc: Steven Rostedt &lt;rostedt@goodmis.org&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Cc: Tommaso Cucinotta &lt;tommaso.cucinotta@sssup.it&gt;
Link: http://lkml.kernel.org/r/edf58354e01db46bf42df8d2dd32418833f68c89.1488392936.git.bristot@redhat.com
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
Signed-off-by: Sasha Levin &lt;alexander.levin@verizon.com&gt;
Signed-off-by: Greg Kroah-Hartman &lt;gregkh@linuxfoundation.org&gt;
</content>
<content type='xhtml'>
<div xmlns='http://www.w3.org/1999/xhtml'>
<pre>
[ Upstream commit df8eac8cafce7d086be3bd5cf5a838fa37594dfb ]

During the activation, CBS checks if it can reuse the current task's
runtime and period. If the deadline of the task is in the past, CBS
cannot use the runtime, and so it replenishes the task. This rule
works fine for implicit deadline tasks (deadline == period), and the
CBS was designed for implicit deadline tasks. However, a task with
constrained deadline (deadine &lt; period) might be awakened after the
deadline, but before the next period. In this case, replenishing the
task would allow it to run for runtime / deadline. As in this case
deadline &lt; period, CBS enables a task to run for more than the
runtime / period. In a very loaded system, this can cause a domino
effect, making other tasks miss their deadlines.

To avoid this problem, in the activation of a constrained deadline
task after the deadline but before the next period, throttle the
task and set the replenishing timer to the begin of the next period,
unless it is boosted.

Reproducer:

 --------------- %&lt; ---------------
  int main (int argc, char **argv)
  {
	int ret;
	int flags = 0;
	unsigned long l = 0;
	struct timespec ts;
	struct sched_attr attr;

	memset(&amp;attr, 0, sizeof(attr));
	attr.size = sizeof(attr);

	attr.sched_policy   = SCHED_DEADLINE;
	attr.sched_runtime  = 2 * 1000 * 1000;		/* 2 ms */
	attr.sched_deadline = 2 * 1000 * 1000;		/* 2 ms */
	attr.sched_period   = 2 * 1000 * 1000 * 1000;	/* 2 s */

	ts.tv_sec = 0;
	ts.tv_nsec = 2000 * 1000;			/* 2 ms */

	ret = sched_setattr(0, &amp;attr, flags);

	if (ret &lt; 0) {
		perror("sched_setattr");
		exit(-1);
	}

	for(;;) {
		/* XXX: you may need to adjust the loop */
		for (l = 0; l &lt; 150000; l++);
		/*
		 * The ideia is to go to sleep right before the deadline
		 * and then wake up before the next period to receive
		 * a new replenishment.
		 */
		nanosleep(&amp;ts, NULL);
	}

	exit(0);
  }
  --------------- &gt;% ---------------

On my box, this reproducer uses almost 50% of the CPU time, which is
obviously wrong for a task with 2/2000 reservation.

Signed-off-by: Daniel Bristot de Oliveira &lt;bristot@redhat.com&gt;
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Cc: Juri Lelli &lt;juri.lelli@arm.com&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Luca Abeni &lt;luca.abeni@santannapisa.it&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Peter Zijlstra &lt;peterz@infradead.org&gt;
Cc: Romulo Silva de Oliveira &lt;romulo.deoliveira@ufsc.br&gt;
Cc: Steven Rostedt &lt;rostedt@goodmis.org&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Cc: Tommaso Cucinotta &lt;tommaso.cucinotta@sssup.it&gt;
Link: http://lkml.kernel.org/r/edf58354e01db46bf42df8d2dd32418833f68c89.1488392936.git.bristot@redhat.com
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
Signed-off-by: Sasha Levin &lt;alexander.levin@verizon.com&gt;
Signed-off-by: Greg Kroah-Hartman &lt;gregkh@linuxfoundation.org&gt;
</pre>
</div>
</content>
</entry>
<entry>
<title>sched/deadline: Make sure the replenishment timer fires in the next period</title>
<updated>2017-12-20T09:04:55+00:00</updated>
<author>
<name>Daniel Bristot de Oliveira</name>
<email>bristot@redhat.com</email>
</author>
<published>2017-03-02T14:10:57+00:00</published>
<link rel='alternate' type='text/html' href='https://git.tavy.me/linux-stable.git/commit/?id=cd0e18d2f24b58f0793f3c7af2d75def1daec8a2'/>
<id>cd0e18d2f24b58f0793f3c7af2d75def1daec8a2</id>
<content type='text'>
[ Upstream commit 5ac69d37784b237707a7b15d199cdb6c6fdb6780 ]

Currently, the replenishment timer is set to fire at the deadline
of a task. Although that works for implicit deadline tasks because the
deadline is equals to the begin of the next period, that is not correct
for constrained deadline tasks (deadline &lt; period).

For instance:

f.c:
 --------------- %&lt; ---------------
int main (void)
{
	for(;;);
}
 --------------- &gt;% ---------------

  # gcc -o f f.c

  # trace-cmd record -e sched:sched_switch                              \
				   -e syscalls:sys_exit_sched_setattr   \
   chrt -d --sched-runtime  490000000					\
           --sched-deadline 500000000					\
	   --sched-period  1000000000 0 ./f

  # trace-cmd report | grep "{pid of ./f}"

After setting parameters, the task is replenished and continue running
until being throttled:

         f-11295 [003] 13322.113776: sys_exit_sched_setattr: 0x0

The task is throttled after running 492318 ms, as expected:

         f-11295 [003] 13322.606094: sched_switch:   f:11295 [-1] R ==&gt; watchdog/3:32 [0]

But then, the task is replenished 500719 ms after the first
replenishment:

    &lt;idle&gt;-0     [003] 13322.614495: sched_switch:   swapper/3:0 [120] R ==&gt; f:11295 [-1]

Running for 490277 ms:

         f-11295 [003] 13323.104772: sched_switch:   f:11295 [-1] R ==&gt;  swapper/3:0 [120]

Hence, in the first period, the task runs 2 * runtime, and that is a bug.

During the first replenishment, the next deadline is set one period away.
So the runtime / period starts to be respected. However, as the second
replenishment took place in the wrong instant, the next replenishment
will also be held in a wrong instant of time. Rather than occurring in
the nth period away from the first activation, it is taking place
in the (nth period - relative deadline).

Signed-off-by: Daniel Bristot de Oliveira &lt;bristot@redhat.com&gt;
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Reviewed-by: Luca Abeni &lt;luca.abeni@santannapisa.it&gt;
Reviewed-by: Steven Rostedt (VMware) &lt;rostedt@goodmis.org&gt;
Reviewed-by: Juri Lelli &lt;juri.lelli@arm.com&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Peter Zijlstra &lt;peterz@infradead.org&gt;
Cc: Romulo Silva de Oliveira &lt;romulo.deoliveira@ufsc.br&gt;
Cc: Steven Rostedt &lt;rostedt@goodmis.org&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Cc: Tommaso Cucinotta &lt;tommaso.cucinotta@sssup.it&gt;
Link: http://lkml.kernel.org/r/ac50d89887c25285b47465638354b63362f8adff.1488392936.git.bristot@redhat.com
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
Signed-off-by: Sasha Levin &lt;alexander.levin@verizon.com&gt;
Signed-off-by: Greg Kroah-Hartman &lt;gregkh@linuxfoundation.org&gt;
</content>
<content type='xhtml'>
<div xmlns='http://www.w3.org/1999/xhtml'>
<pre>
[ Upstream commit 5ac69d37784b237707a7b15d199cdb6c6fdb6780 ]

Currently, the replenishment timer is set to fire at the deadline
of a task. Although that works for implicit deadline tasks because the
deadline is equals to the begin of the next period, that is not correct
for constrained deadline tasks (deadline &lt; period).

For instance:

f.c:
 --------------- %&lt; ---------------
int main (void)
{
	for(;;);
}
 --------------- &gt;% ---------------

  # gcc -o f f.c

  # trace-cmd record -e sched:sched_switch                              \
				   -e syscalls:sys_exit_sched_setattr   \
   chrt -d --sched-runtime  490000000					\
           --sched-deadline 500000000					\
	   --sched-period  1000000000 0 ./f

  # trace-cmd report | grep "{pid of ./f}"

After setting parameters, the task is replenished and continue running
until being throttled:

         f-11295 [003] 13322.113776: sys_exit_sched_setattr: 0x0

The task is throttled after running 492318 ms, as expected:

         f-11295 [003] 13322.606094: sched_switch:   f:11295 [-1] R ==&gt; watchdog/3:32 [0]

But then, the task is replenished 500719 ms after the first
replenishment:

    &lt;idle&gt;-0     [003] 13322.614495: sched_switch:   swapper/3:0 [120] R ==&gt; f:11295 [-1]

Running for 490277 ms:

         f-11295 [003] 13323.104772: sched_switch:   f:11295 [-1] R ==&gt;  swapper/3:0 [120]

Hence, in the first period, the task runs 2 * runtime, and that is a bug.

During the first replenishment, the next deadline is set one period away.
So the runtime / period starts to be respected. However, as the second
replenishment took place in the wrong instant, the next replenishment
will also be held in a wrong instant of time. Rather than occurring in
the nth period away from the first activation, it is taking place
in the (nth period - relative deadline).

Signed-off-by: Daniel Bristot de Oliveira &lt;bristot@redhat.com&gt;
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Reviewed-by: Luca Abeni &lt;luca.abeni@santannapisa.it&gt;
Reviewed-by: Steven Rostedt (VMware) &lt;rostedt@goodmis.org&gt;
Reviewed-by: Juri Lelli &lt;juri.lelli@arm.com&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Peter Zijlstra &lt;peterz@infradead.org&gt;
Cc: Romulo Silva de Oliveira &lt;romulo.deoliveira@ufsc.br&gt;
Cc: Steven Rostedt &lt;rostedt@goodmis.org&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Cc: Tommaso Cucinotta &lt;tommaso.cucinotta@sssup.it&gt;
Link: http://lkml.kernel.org/r/ac50d89887c25285b47465638354b63362f8adff.1488392936.git.bristot@redhat.com
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
Signed-off-by: Sasha Levin &lt;alexander.levin@verizon.com&gt;
Signed-off-by: Greg Kroah-Hartman &lt;gregkh@linuxfoundation.org&gt;
</pre>
</div>
</content>
</entry>
<entry>
<title>sched/rt: Add a missing rescheduling point</title>
<updated>2017-03-31T07:49:54+00:00</updated>
<author>
<name>Sebastian Andrzej Siewior</name>
<email>bigeasy@linutronix.de</email>
</author>
<published>2017-01-24T14:40:06+00:00</published>
<link rel='alternate' type='text/html' href='https://git.tavy.me/linux-stable.git/commit/?id=2bed5987692cb6dc3bf3ce15d8abeb79fdf4ab2a'/>
<id>2bed5987692cb6dc3bf3ce15d8abeb79fdf4ab2a</id>
<content type='text'>
commit 619bd4a71874a8fd78eb6ccf9f272c5e98bcc7b7 upstream.

Since the change in commit:

  fd7a4bed1835 ("sched, rt: Convert switched_{from, to}_rt() / prio_changed_rt() to balance callbacks")

... we don't reschedule a task under certain circumstances:

Lets say task-A, SCHED_OTHER, is running on CPU0 (and it may run only on
CPU0) and holds a PI lock. This task is removed from the CPU because it
used up its time slice and another SCHED_OTHER task is running. Task-B on
CPU1 runs at RT priority and asks for the lock owned by task-A. This
results in a priority boost for task-A. Task-B goes to sleep until the
lock has been made available. Task-A is already runnable (but not active),
so it receives no wake up.

The reality now is that task-A gets on the CPU once the scheduler decides
to remove the current task despite the fact that a high priority task is
enqueued and waiting. This may take a long time.

The desired behaviour is that CPU0 immediately reschedules after the
priority boost which made task-A the task with the lowest priority.

Suggested-by: Peter Zijlstra &lt;peterz@infradead.org&gt;
Signed-off-by: Sebastian Andrzej Siewior &lt;bigeasy@linutronix.de&gt;
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Fixes: fd7a4bed1835 ("sched, rt: Convert switched_{from, to}_rt() prio_changed_rt() to balance callbacks")
Link: http://lkml.kernel.org/r/20170124144006.29821-1-bigeasy@linutronix.de
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
Signed-off-by: Greg Kroah-Hartman &lt;gregkh@linuxfoundation.org&gt;

</content>
<content type='xhtml'>
<div xmlns='http://www.w3.org/1999/xhtml'>
<pre>
commit 619bd4a71874a8fd78eb6ccf9f272c5e98bcc7b7 upstream.

Since the change in commit:

  fd7a4bed1835 ("sched, rt: Convert switched_{from, to}_rt() / prio_changed_rt() to balance callbacks")

... we don't reschedule a task under certain circumstances:

Lets say task-A, SCHED_OTHER, is running on CPU0 (and it may run only on
CPU0) and holds a PI lock. This task is removed from the CPU because it
used up its time slice and another SCHED_OTHER task is running. Task-B on
CPU1 runs at RT priority and asks for the lock owned by task-A. This
results in a priority boost for task-A. Task-B goes to sleep until the
lock has been made available. Task-A is already runnable (but not active),
so it receives no wake up.

The reality now is that task-A gets on the CPU once the scheduler decides
to remove the current task despite the fact that a high priority task is
enqueued and waiting. This may take a long time.

The desired behaviour is that CPU0 immediately reschedules after the
priority boost which made task-A the task with the lowest priority.

Suggested-by: Peter Zijlstra &lt;peterz@infradead.org&gt;
Signed-off-by: Sebastian Andrzej Siewior &lt;bigeasy@linutronix.de&gt;
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Fixes: fd7a4bed1835 ("sched, rt: Convert switched_{from, to}_rt() prio_changed_rt() to balance callbacks")
Link: http://lkml.kernel.org/r/20170124144006.29821-1-bigeasy@linutronix.de
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
Signed-off-by: Greg Kroah-Hartman &lt;gregkh@linuxfoundation.org&gt;

</pre>
</div>
</content>
</entry>
<entry>
<title>sched/core: Add missing lockdep_unpin() annotations</title>
<updated>2015-10-23T10:02:10+00:00</updated>
<author>
<name>Peter Zijlstra</name>
<email>peterz@infradead.org</email>
</author>
<published>2015-10-23T09:50:08+00:00</published>
<link rel='alternate' type='text/html' href='https://git.tavy.me/linux-stable.git/commit/?id=0aaafaabfcba8aa991913cd3280a5dbf7f111a2a'/>
<id>0aaafaabfcba8aa991913cd3280a5dbf7f111a2a</id>
<content type='text'>
Luca and Wanpeng reported two missing annotations that led to
false lockdep complaints. Add the missing annotations.

Reported-by: Luca Abeni &lt;luca.abeni@unitn.it&gt;
Reported-by: Wanpeng Li &lt;wanpeng.li@hotmail.com&gt;
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Cc: Juri Lelli &lt;juri.lelli@arm.com&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Peter Zijlstra &lt;peterz@infradead.org&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Fixes: cbce1a686700 ("sched,lockdep: Employ lock pinning")
Link: http://lkml.kernel.org/r/20151023095008.GY17308@twins.programming.kicks-ass.net
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
</content>
<content type='xhtml'>
<div xmlns='http://www.w3.org/1999/xhtml'>
<pre>
Luca and Wanpeng reported two missing annotations that led to
false lockdep complaints. Add the missing annotations.

Reported-by: Luca Abeni &lt;luca.abeni@unitn.it&gt;
Reported-by: Wanpeng Li &lt;wanpeng.li@hotmail.com&gt;
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Cc: Juri Lelli &lt;juri.lelli@arm.com&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Peter Zijlstra &lt;peterz@infradead.org&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Fixes: cbce1a686700 ("sched,lockdep: Employ lock pinning")
Link: http://lkml.kernel.org/r/20151023095008.GY17308@twins.programming.kicks-ass.net
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
</pre>
</div>
</content>
</entry>
<entry>
<title>sched/deadline: Fix migration of SCHED_DEADLINE tasks</title>
<updated>2015-10-20T08:13:36+00:00</updated>
<author>
<name>Luca Abeni</name>
<email>luca.abeni@unitn.it</email>
</author>
<published>2015-10-16T08:06:21+00:00</published>
<link rel='alternate' type='text/html' href='https://git.tavy.me/linux-stable.git/commit/?id=5aa5050787f449e7eaef2c5ec93c7b357aa7dcdc'/>
<id>5aa5050787f449e7eaef2c5ec93c7b357aa7dcdc</id>
<content type='text'>
Commit:

  9d5142624256 ("sched/deadline: Reduce rq lock contention by eliminating locking of non-feasible target")

broke select_task_rq_dl() and find_lock_later_rq(), because it introduced
a comparison between the local task's deadline and dl.earliest_dl.curr of
the remote queue.

However, if the remote runqueue does not contain any SCHED_DEADLINE
task its earliest_dl.curr is 0 (always smaller than the deadline of
the local task) and the remote runqueue is not selected for pushing.

As a result, if an application creates multiple SCHED_DEADLINE
threads, they will never be pushed to runqueues that do not already
contain SCHED_DEADLINE tasks.

This patch fixes the issue by checking if dl.dl_nr_running == 0.

Signed-off-by: Luca Abeni &lt;luca.abeni@unitn.it&gt;
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Cc: Juri Lelli &lt;juri.lelli@arm.com&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Peter Zijlstra &lt;peterz@infradead.org&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Cc: Wanpeng Li &lt;wanpeng.li@linux.intel.com&gt;
Fixes: 9d5142624256 ("sched/deadline: Reduce rq lock contention by eliminating locking of non-feasible target")
Link: http://lkml.kernel.org/r/1444982781-15608-1-git-send-email-luca.abeni@unitn.it
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
</content>
<content type='xhtml'>
<div xmlns='http://www.w3.org/1999/xhtml'>
<pre>
Commit:

  9d5142624256 ("sched/deadline: Reduce rq lock contention by eliminating locking of non-feasible target")

broke select_task_rq_dl() and find_lock_later_rq(), because it introduced
a comparison between the local task's deadline and dl.earliest_dl.curr of
the remote queue.

However, if the remote runqueue does not contain any SCHED_DEADLINE
task its earliest_dl.curr is 0 (always smaller than the deadline of
the local task) and the remote runqueue is not selected for pushing.

As a result, if an application creates multiple SCHED_DEADLINE
threads, they will never be pushed to runqueues that do not already
contain SCHED_DEADLINE tasks.

This patch fixes the issue by checking if dl.dl_nr_running == 0.

Signed-off-by: Luca Abeni &lt;luca.abeni@unitn.it&gt;
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Cc: Juri Lelli &lt;juri.lelli@arm.com&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Peter Zijlstra &lt;peterz@infradead.org&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Cc: Wanpeng Li &lt;wanpeng.li@linux.intel.com&gt;
Fixes: 9d5142624256 ("sched/deadline: Reduce rq lock contention by eliminating locking of non-feasible target")
Link: http://lkml.kernel.org/r/1444982781-15608-1-git-send-email-luca.abeni@unitn.it
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
</pre>
</div>
</content>
</entry>
<entry>
<title>sched/deadline: Fix comment in enqueue_task_dl()</title>
<updated>2015-08-12T10:06:10+00:00</updated>
<author>
<name>Andrea Parri</name>
<email>parri.andrea@gmail.com</email>
</author>
<published>2015-08-05T13:56:19+00:00</published>
<link rel='alternate' type='text/html' href='https://git.tavy.me/linux-stable.git/commit/?id=ff277d4250fe715b6666219b1a3423b863418794'/>
<id>ff277d4250fe715b6666219b1a3423b863418794</id>
<content type='text'>
The "dl_boosted" flag is set by comparing *absolute* deadlines
(c.f., rt_mutex_setprio()).

Signed-off-by: Andrea Parri &lt;parri.andrea@gmail.com&gt;
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Peter Zijlstra &lt;peterz@infradead.org&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Link: http://lkml.kernel.org/r/1438782979-9057-2-git-send-email-parri.andrea@gmail.com
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
</content>
<content type='xhtml'>
<div xmlns='http://www.w3.org/1999/xhtml'>
<pre>
The "dl_boosted" flag is set by comparing *absolute* deadlines
(c.f., rt_mutex_setprio()).

Signed-off-by: Andrea Parri &lt;parri.andrea@gmail.com&gt;
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Peter Zijlstra &lt;peterz@infradead.org&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Link: http://lkml.kernel.org/r/1438782979-9057-2-git-send-email-parri.andrea@gmail.com
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
</pre>
</div>
</content>
</entry>
<entry>
<title>sched/deadline: Fix comment in push_dl_tasks()</title>
<updated>2015-08-12T10:06:10+00:00</updated>
<author>
<name>Andrea Parri</name>
<email>parri.andrea@gmail.com</email>
</author>
<published>2015-08-05T13:56:18+00:00</published>
<link rel='alternate' type='text/html' href='https://git.tavy.me/linux-stable.git/commit/?id=4ffa08ed4cc4c5d47d197d749aae6f79af91eb73'/>
<id>4ffa08ed4cc4c5d47d197d749aae6f79af91eb73</id>
<content type='text'>
The comment is "misleading"; fix it by adapting a comment from
push_rt_tasks().

Signed-off-by: Andrea Parri &lt;parri.andrea@gmail.com&gt;
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Peter Zijlstra &lt;peterz@infradead.org&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Link: http://lkml.kernel.org/r/1438782979-9057-1-git-send-email-parri.andrea@gmail.com
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
</content>
<content type='xhtml'>
<div xmlns='http://www.w3.org/1999/xhtml'>
<pre>
The comment is "misleading"; fix it by adapting a comment from
push_rt_tasks().

Signed-off-by: Andrea Parri &lt;parri.andrea@gmail.com&gt;
Signed-off-by: Peter Zijlstra (Intel) &lt;peterz@infradead.org&gt;
Cc: Linus Torvalds &lt;torvalds@linux-foundation.org&gt;
Cc: Mike Galbraith &lt;efault@gmx.de&gt;
Cc: Peter Zijlstra &lt;peterz@infradead.org&gt;
Cc: Thomas Gleixner &lt;tglx@linutronix.de&gt;
Link: http://lkml.kernel.org/r/1438782979-9057-1-git-send-email-parri.andrea@gmail.com
Signed-off-by: Ingo Molnar &lt;mingo@kernel.org&gt;
</pre>
</div>
</content>
</entry>
</feed>
